An overview
  Infrastructure system
   - Transport network
    - Irrigation
    - Power supply
    - Water supply
    - Communication
    - Banking
  Potential, development orientation
   - Agriculture and forestry
   - Aqua-cultural produces
   - Industrial & handricraft industry
   - Tourism  
  Investment priority policies
   - For foreign direct investment (FDI)
   - For local investment
   - For infrastructure construction investment
  Socio-economic development programs
  The list of priority investment projects
 

   The lists of projects that are given priorities to mobilize ODA

  

Project name

Location

Project scale

USD millon

ODA

Domestic

I. Irrigation:
1. Bieu river reservoir

Ninh Phuoc

Capacity 17.4 million m3 irrigation dams and canals

4.5

0.5

2. Plan for the protection og river banks and dike system

Phan Rang-Thap Cham

Build 10 km of surrounding dike, and embankment system.

7.0

1.0

3. Tan My reservoir

Ninh Son

Irrigating for 3,700 ha, capacity of 53.7 million m3

9.5

1.5

4. Cai river reservoir

Ninh Son

Irrigating for 600 ha, capacity of 97.8 million m3

9.0

1.0

5. Than river reservoir

Ninh Son

Irrigating for 3,700 ha, capacity of 48.2 million m3

10.0

2.0

6. Lanh Ra irrigation works

Ninh Phuoc

Lanh Ra reservoir with 17.5 million m3 and channel system for irrigation of 1,000 ha agricultural land.

4.5

1.5

7. Medium and small irrigation works

Ninh Son and Ninh Phuoc district

Including 6 reservoirs with a total of 43 million m3, ensuring irrigation for 3,600 ha for cultivated land.

12.5

1.5

II. Transport:
1. Construction of two-way road leading to two ends of the town.

Phan Rang-Thap Cham

4.7 km long

6.0

1.5

2. 21th August street upgrading

Phan Rang-Thap Cham

3 km long

3.5

1.0

3. Ninh Binh, Phuoc Binh street upgrading

Bac Ai

Upgrading and improving 22 km with level 5 standard for delta-based roads;…

6.0

1.6

4. Cau Mong-Phuoc Son street upgrading

Ninh Phuoc

Upgrading 15 km with level 4 standard for delta-based roads; 7 km with level 5 standard for delta-based roads.

11.5

2.0

5. Rural and mountainous transportaion development.

Bac Ai

Upgrading 60 km level 5 standard for delta-based roads.

2.5

1.0

III. Water supply and sewerage:
1. Water supply for Quan The–Ca Na urban area.

Ninh Phuoc

Capacity 8,00 m3/day

6.5

2.0

2. Project for sewerage for flood prevention in the town.

Phan Rang-Thap Cham

 

2.5

1.0

IV. Medical care:
Medical equipment and upgrading and health care capacity improvement

Districts and Phan Rang-Thap Cham town

Equip medical equipment for provincial and district hospitals as well as commune-level medical centers.

4.0

0.5

V. Construction:
Build houses in the urban area of K1-Thanh Son

Phan Rang-Thap Cham

About 100 ha.

27.0

2.0